* add store entity and migration
* make store service take both isar and drift repos
* migrate and switch store on beta timeline state change
* chore: make drift variables final
* dispose old store before switching repos
* use store to update values for beta timeline
* change log service to use the proper store
* migrate store when beta already enabled
* use isar repository to check beta timeline in store service
* remove unused update method from store repo
* dispose after create
* change watchAll signature in store repo
* fix test
* rename init isar to initDB
* request user to close and reopen on beta migration
* fix tests
* handle empty version in migration
* wait for cache to be populated after migration
---------
Co-authored-by: shenlong-tanwen <139912620+shalong-tanwen@users.noreply.github.com>
Co-authored-by: Alex <alex.tran1502@gmail.com>
* feat: use drift for logging
* fix: tests
* feat: use the truncate limit from constants.ts as default
* chore: move setupAll to top level and restructure
* chore: code review changes
* fix: inherits
* feat: raise log line limit to 2000
* limit getAll to 250 lines
* delete DLog and make LogRepository not a singleton
* fix: drift build settings and `make migration`
* fix: tests
* remove sensitive log
---------
Co-authored-by: Alex <alex.tran1502@gmail.com>